SignalPe
OperationalTelanganaAndhra PradeshSouth India

Hyderabad–Vijayawada Highway (NH-65)

Hyderabad (Panthangi) to Vijayawada (Nandigama) · 221 km · 4 lanes (six-laning approved)

Written and checked byRamanathan Virli· Roads & Infrastructure

The four-lane Hyderabad–Vijayawada section of NH-65, developed by GMR on a build-own-operate-transfer basis and opened in 2012. It is a national highway rather than a greenfield expressway. The Centre has approved six-laning of about 229 km (km 40 to km 269) at ₹10,391.53 crore, with service roads and controlled access; NHAI set 11 November 2026 as the bid deadline and expects work to begin in January 2027.

Hyderabad-Vijayawada Highway route map

  1. Hyderabad (Panthangi)Start point
  2. Vijayawada (Nandigama)End point

Panthangi (Hyderabad), Nalgonda, Suryapet, Kodad, Nandigama (Vijayawada)

Major cities & towns

5 along the route
HyderabadSuryapetKodadNalgondaVijayawada

Key features

  • Four-lane section of NH-65
  • Developed by GMR on a BOOT basis
  • Six-laning approved at ₹10,391.53 crore
  • Six-laning works expected to begin January 2027

Safety tips for driving on the Hyderabad-Vijayawada Highway

112Unified emergency number
1033National Highway helpline
  • Strictly follow the speed limit of 100 km/h. Overspeeding on expressways attracts heavy fines.
  • Always wear seatbelts. Rear-seat passengers must also buckle up on expressways.
  • Do not stop on the main carriageway. Use designated rest areas and parking zones.
  • Maintain lane discipline — use the right lane only for overtaking.
  • Keep a safe following distance of at least 3 seconds at expressway speeds.
  • Use headlights even during daytime as per expressway rules.
  • In case of breakdown, move to the shoulder immediately and use hazard lights.

Frequently asked questions

What is the total length of the Hyderabad-Vijayawada Highway?

The Hyderabad-Vijayawada Highway has a total length of 221 km. It connects Hyderabad (Panthangi) to Vijayawada (Nandigama).

What is the current status of the Hyderabad-Vijayawada Highway?

The Hyderabad-Vijayawada Highway is fully operational, having been opened in 2012.

Which states does the Hyderabad-Vijayawada Highway pass through?

The Hyderabad-Vijayawada Highway passes through Telangana and Andhra Pradesh.

What is the speed limit on the Hyderabad-Vijayawada Highway?

The speed limit on the Hyderabad-Vijayawada Highway is 100 km/h.

How many lanes does the Hyderabad-Vijayawada Highway have?

The Hyderabad-Vijayawada Highway has 4 lanes (six-laning approved).

What are the major cities connected by the Hyderabad-Vijayawada Highway?

The major cities and towns along the Hyderabad-Vijayawada Highway include Hyderabad, Suryapet, Kodad, Nalgonda, Vijayawada.

Who is the operator of the Hyderabad-Vijayawada Highway?

The Hyderabad-Vijayawada Highway is operated/developed by GMR Hyderabad Vijayawada Expressways Pvt Ltd (BOOT basis).

What are the key features of the Hyderabad-Vijayawada Highway?

Key features of the Hyderabad-Vijayawada Highway include: Four-lane section of NH-65; Developed by GMR on a BOOT basis; Six-laning approved at ₹10,391.53 crore; Six-laning works expected to begin January 2027.

Related expressways

Explore more on SignalPe

← All expressways