Hyderabad–Vijayawada Highway (NH-65)
Hyderabad (Panthangi) to Vijayawada (Nandigama) · 221 km · 4 lanes (six-laning approved)
Written and checked byRamanathan Virli· Roads & Infrastructure
The four-lane Hyderabad–Vijayawada section of NH-65, developed by GMR on a build-own-operate-transfer basis and opened in 2012. It is a national highway rather than a greenfield expressway. The Centre has approved six-laning of about 229 km (km 40 to km 269) at ₹10,391.53 crore, with service roads and controlled access; NHAI set 11 November 2026 as the bid deadline and expects work to begin in January 2027.
Hyderabad-Vijayawada Highway route map
- Hyderabad (Panthangi)Start point
- Vijayawada (Nandigama)End point
Panthangi (Hyderabad), Nalgonda, Suryapet, Kodad, Nandigama (Vijayawada)
Major cities & towns
5 along the routeKey features
- Four-lane section of NH-65
- Developed by GMR on a BOOT basis
- Six-laning approved at ₹10,391.53 crore
- Six-laning works expected to begin January 2027
Safety tips for driving on the Hyderabad-Vijayawada Highway
- Strictly follow the speed limit of 100 km/h. Overspeeding on expressways attracts heavy fines.
- Always wear seatbelts. Rear-seat passengers must also buckle up on expressways.
- Do not stop on the main carriageway. Use designated rest areas and parking zones.
- Maintain lane discipline — use the right lane only for overtaking.
- Keep a safe following distance of at least 3 seconds at expressway speeds.
- Use headlights even during daytime as per expressway rules.
- In case of breakdown, move to the shoulder immediately and use hazard lights.
Frequently asked questions
What is the total length of the Hyderabad-Vijayawada Highway?
The Hyderabad-Vijayawada Highway has a total length of 221 km. It connects Hyderabad (Panthangi) to Vijayawada (Nandigama).
What is the current status of the Hyderabad-Vijayawada Highway?
The Hyderabad-Vijayawada Highway is fully operational, having been opened in 2012.
Which states does the Hyderabad-Vijayawada Highway pass through?
The Hyderabad-Vijayawada Highway passes through Telangana and Andhra Pradesh.
What is the speed limit on the Hyderabad-Vijayawada Highway?
The speed limit on the Hyderabad-Vijayawada Highway is 100 km/h.
How many lanes does the Hyderabad-Vijayawada Highway have?
The Hyderabad-Vijayawada Highway has 4 lanes (six-laning approved).
What are the major cities connected by the Hyderabad-Vijayawada Highway?
The major cities and towns along the Hyderabad-Vijayawada Highway include Hyderabad, Suryapet, Kodad, Nalgonda, Vijayawada.
Who is the operator of the Hyderabad-Vijayawada Highway?
The Hyderabad-Vijayawada Highway is operated/developed by GMR Hyderabad Vijayawada Expressways Pvt Ltd (BOOT basis).
What are the key features of the Hyderabad-Vijayawada Highway?
Key features of the Hyderabad-Vijayawada Highway include: Four-lane section of NH-65; Developed by GMR on a BOOT basis; Six-laning approved at ₹10,391.53 crore; Six-laning works expected to begin January 2027.