🛣️OperationalSouth India

Vijayawada–Hyderabad Expressway

Hyderabad (Panthangi) to Vijayawada (Nandigama)221 km · 6 lanes

A 221 km expressway connecting Hyderabad and Vijayawada, the two largest cities in Telangana and Andhra Pradesh respectively. Built on a BOOT model by GMR Group, it was opened to the public in October 2012.

221

Kilometres

6

Lanes

100 km/h

Speed Limit

2

States

Vijayawada-Hyderabad Expressway Route Map

Panthangi (Hyderabad), Nalgonda, Suryapet, Kodad, Nandigama (Vijayawada)

Vijayawada-Hyderabad Expressway Start and End Point

Start Point (Origin)

Hyderabad (Panthangi)

End Point (Terminus)

Vijayawada (Nandigama)

States & Union Territories

TelanganaAndhra Pradesh

Major Cities & Towns

HyderabadSuryapetKodadNalgondaVijayawada

Key Features

  • Built on Build-Own-Operate-Transfer (BOOT) model
  • Operated by GMR Group subsidiary
  • Connects capitals of Telangana and residual AP
  • Reduces travel time from 5 hours to 2.5 hours

Project Details

NameVijayawada–Hyderabad Expressway
Total Length221 km
Lanes6 lanes
Speed Limit100 km/h
StatusOperational
Operator / DeveloperGMR Hyderabad Vijayawada Expressways Pvt Ltd (BOOT basis)
Year Opened2012
Project CostRs 1,470 Crore
RegionSouth India

Safety Tips for Driving on the Vijayawada-Hyderabad Expressway

  • ⚠️Strictly follow the speed limit of 100 km/h. Overspeeding on expressways attracts heavy fines.
  • ⚠️Always wear seatbelts. Rear-seat passengers must also buckle up on expressways.
  • ⚠️Do not stop on the main carriageway. Use designated rest areas and parking zones.
  • ⚠️Maintain lane discipline — use the right lane only for overtaking.
  • ⚠️Keep a safe following distance of at least 3 seconds at expressway speeds.
  • ⚠️Use headlights even during daytime as per expressway rules.
  • ⚠️In case of breakdown, move to the shoulder immediately and use hazard lights.
  • ⚠️In an emergency, call 112 (Unified Emergency) or 1033 (Highway Helpline).

Frequently Asked Questions

What is the total length of the Vijayawada-Hyderabad Expressway?
The Vijayawada-Hyderabad Expressway has a total length of 221 km. It connects Hyderabad (Panthangi) to Vijayawada (Nandigama).
What is the current status of the Vijayawada-Hyderabad Expressway?
The Vijayawada-Hyderabad Expressway is fully operational, having been opened in 2012.
Which states does the Vijayawada-Hyderabad Expressway pass through?
The Vijayawada-Hyderabad Expressway passes through Telangana and Andhra Pradesh.
What is the speed limit on the Vijayawada-Hyderabad Expressway?
The speed limit on the Vijayawada-Hyderabad Expressway is 100 km/h.
How many lanes does the Vijayawada-Hyderabad Expressway have?
The Vijayawada-Hyderabad Expressway has 6 lanes.
What is the cost of the Vijayawada-Hyderabad Expressway project?
The Vijayawada-Hyderabad Expressway project has an estimated cost of Rs 1,470 crore.
What are the major cities connected by the Vijayawada-Hyderabad Expressway?
The major cities and towns along the Vijayawada-Hyderabad Expressway include Hyderabad, Suryapet, Kodad, Nalgonda, Vijayawada.
Who is the operator of the Vijayawada-Hyderabad Expressway?
The Vijayawada-Hyderabad Expressway is operated/developed by GMR Hyderabad Vijayawada Expressways Pvt Ltd (BOOT basis).
What are the key features of the Vijayawada-Hyderabad Expressway?
Key features of the Vijayawada-Hyderabad Expressway include: Built on Build-Own-Operate-Transfer (BOOT) model; Operated by GMR Group subsidiary; Connects capitals of Telangana and residual AP; Reduces travel time from 5 hours to 2.5 hours.

Planning a Trip on the Vijayawada-Hyderabad Expressway?

Check out our road safety guides and expressway speed limits.

Related Expressways

Other Expressways in Telangana

Explore More on SignalPe