SignalPe
Under constructionMaharashtraKarnatakaTelangana+2 moreSouth India

Surat–Chennai Expressway (now Nashik–Chennai)

Nashik (Maharashtra) to Chennai (Tamil Nadu) · 6 lanes

Written and checked byRamanathan Virli· Roads & Infrastructure

Originally planned as a 1,271 km greenfield corridor from Surat to Chennai. MoRTH later curtailed it to start from Nashik instead of Surat, citing land-acquisition and clearance problems, with a separate MSRDC greenfield road linking towards Surat. NHAI invited bids in 2026 for the 374 km Nashik–Akkalkot section (see the Nashik–Solapur–Akkalkot corridor); the southern sections run on to Chennai through Karnataka, Telangana and Andhra Pradesh.

Surat-Chennai Expressway route map

  1. Nashik (Maharashtra)Start point
  2. Chennai (Tamil Nadu)End point

Nashik, Ahilyanagar, Solapur, Akkalkot, Kurnool, Chennai

Major cities & towns

6 along the route
NashikAhilyanagarSolapurAkkalkotKurnoolChennai

Key features

  • Originally planned as 1,271 km from Surat to Chennai
  • Now begins at Nashik instead of Surat
  • Nashik–Akkalkot section put out to bid in 2026
  • Part of Bharatmala Pariyojana

Safety tips for driving on the Surat-Chennai Expressway

112Unified emergency number
1033National Highway helpline
  • Strictly follow the speed limit of 120 km/h. Overspeeding on expressways attracts heavy fines.
  • Always wear seatbelts. Rear-seat passengers must also buckle up on expressways.
  • Do not stop on the main carriageway. Use designated rest areas and parking zones.
  • Maintain lane discipline — use the right lane only for overtaking.
  • Keep a safe following distance of at least 3 seconds at expressway speeds.
  • Use headlights even during daytime as per expressway rules.
  • In case of breakdown, move to the shoulder immediately and use hazard lights.

Frequently asked questions

What is the total length of the Surat-Chennai Expressway?

The Surat-Chennai Expressway has a total length of km. It connects Nashik (Maharashtra) to Chennai (Tamil Nadu).

What is the current status of the Surat-Chennai Expressway?

The Surat-Chennai Expressway is currently under construction and is expected to be completed by 2029.

Which states does the Surat-Chennai Expressway pass through?

The Surat-Chennai Expressway passes through Maharashtra, Karnataka, Telangana, Andhra Pradesh and Tamil Nadu.

What is the speed limit on the Surat-Chennai Expressway?

The speed limit on the Surat-Chennai Expressway is 120 km/h.

How many lanes does the Surat-Chennai Expressway have?

The Surat-Chennai Expressway has 6 lanes.

What are the major cities connected by the Surat-Chennai Expressway?

The major cities and towns along the Surat-Chennai Expressway include Nashik, Ahilyanagar, Solapur, Akkalkot, Kurnool, Chennai.

Who is the operator of the Surat-Chennai Expressway?

The Surat-Chennai Expressway is operated/developed by National Highways Authority of India (NHAI).

What are the key features of the Surat-Chennai Expressway?

Key features of the Surat-Chennai Expressway include: Originally planned as 1,271 km from Surat to Chennai; Now begins at Nashik instead of Surat; Nashik–Akkalkot section put out to bid in 2026; Part of Bharatmala Pariyojana.

Related expressways

Explore more on SignalPe

← All expressways