Bengaluru–Vijayawada Expressway
Bengaluru (Karnataka) to Vijayawada (Andhra Pradesh) · 518 km · 4/6 lanes
Written and checked byRamanathan Virli· Roads & Infrastructure
A 518 km corridor linking Bengaluru to Vijayawada, of which about 343 km is a new greenfield expressway in Andhra Pradesh from Kodikonda (Sri Sathya Sai district), linked to NH-44 towards Bengaluru, to Addanki/Muppavaram in Prakasam district, linked to NH-16 towards Vijayawada. The foundation stone was laid on 11 March 2024; the project is under construction with no section yet open, and completion is targeted for 2027.
Bengaluru-Vijayawada Expressway route map
- Bengaluru (Karnataka)Start point
- Vijayawada (Andhra Pradesh)End point
Bengaluru (NH-44), Kodikonda, Gorantla, Kadiri, Pulivendula, Yerraguntla, Mydukur, Podili, Kanigiri, Addanki (Prakasam), Vijayawada (NH-16)
Major cities & towns
8 along the routeKey features
- About 343 km greenfield section in Andhra Pradesh
- Foundation stone laid on 11 March 2024
- Runs through the Rayalaseema region (Kadiri, Pulivendula, Kadapa district) to Prakasam district
- Completion targeted for 2027
- Part of Bharatmala Pariyojana
Safety tips for driving on the Bengaluru-Vijayawada Expressway
- Strictly follow the speed limit of 120 km/h. Overspeeding on expressways attracts heavy fines.
- Always wear seatbelts. Rear-seat passengers must also buckle up on expressways.
- Do not stop on the main carriageway. Use designated rest areas and parking zones.
- Maintain lane discipline — use the right lane only for overtaking.
- Keep a safe following distance of at least 3 seconds at expressway speeds.
- Use headlights even during daytime as per expressway rules.
- In case of breakdown, move to the shoulder immediately and use hazard lights.
Frequently asked questions
What is the total length of the Bengaluru-Vijayawada Expressway?
The Bengaluru-Vijayawada Expressway has a total length of 518 km. It connects Bengaluru (Karnataka) to Vijayawada (Andhra Pradesh).
What is the current status of the Bengaluru-Vijayawada Expressway?
The Bengaluru-Vijayawada Expressway is currently under construction and is expected to be completed by 2027.
Which states does the Bengaluru-Vijayawada Expressway pass through?
The Bengaluru-Vijayawada Expressway passes through Karnataka and Andhra Pradesh.
What is the speed limit on the Bengaluru-Vijayawada Expressway?
The speed limit on the Bengaluru-Vijayawada Expressway is 120 km/h.
How many lanes does the Bengaluru-Vijayawada Expressway have?
The Bengaluru-Vijayawada Expressway has 4/6 lanes.
What are the major cities connected by the Bengaluru-Vijayawada Expressway?
The major cities and towns along the Bengaluru-Vijayawada Expressway include Bengaluru, Kodikonda, Kadiri, Pulivendula, Kadapa, Podili, Addanki, Vijayawada.
Who is the operator of the Bengaluru-Vijayawada Expressway?
The Bengaluru-Vijayawada Expressway is operated/developed by National Highways Authority of India (NHAI).
What are the key features of the Bengaluru-Vijayawada Expressway?
Key features of the Bengaluru-Vijayawada Expressway include: About 343 km greenfield section in Andhra Pradesh; Foundation stone laid on 11 March 2024; Runs through the Rayalaseema region (Kadiri, Pulivendula, Kadapa district) to Prakasam district; Completion targeted for 2027; Part of Bharatmala Pariyojana.