🛣️Under ConstructionWest India

Nashik–Solapur–Akkalkot Greenfield Corridor

Nashik (Maharashtra) to Akkalkot (Solapur, Maharashtra)374 km · 6 lanes (access-controlled)

A 374 km greenfield 6-lane access-controlled expressway in Maharashtra connecting Nashik to Akkalkot via Solapur, approved by CCEA on December 31, 2025 at a cost of ₹19,142 crore on BOT-Toll basis. It saves 201 km in travel distance and up to 17 hours travel time. Links to Delhi-Mumbai Expressway, Samruddhi Mahamarg, and Agra-Mumbai Corridor (NH-60).

374

Kilometres

6

Lanes

100 km/h

Speed Limit

1

State

Nashik-Solapur-Akkalkot Expressway Route Map

Nashik (Adgaon interchange on NH-60), Ahmednagar, Solapur, Akkalkot

Nashik-Solapur-Akkalkot Expressway Start and End Point

Start Point (Origin)

Nashik (Maharashtra)

End Point (Terminus)

Akkalkot (Solapur, Maharashtra)

States & Union Territories

Maharashtra

Major Cities & Towns

NashikAhmednagarSolapurAkkalkot

Key Features

  • CCEA approved December 31, 2025 at ₹19,142 crore (BOT-Toll)
  • Saves 201 km distance and up to 17 hours travel time
  • Connects to Delhi-Mumbai Expressway near Vadhavan Port interchange
  • Links Samruddhi Mahamarg (Pangri near Nashik) and Agra-Mumbai Corridor (NH-60 at Adgaon)
  • Expected to generate ~251 lakh direct + ~314 lakh indirect man-days employment
  • Entirely within Maharashtra

Project Details

NameNashik–Solapur–Akkalkot Greenfield Corridor
Total Length374 km
Lanes6 lanes (access-controlled)
Speed Limit100 km/h
StatusUnder Construction
Operator / DeveloperNational Highways Authority of India (NHAI)
Expected Completion2028
Project CostRs 19,142 Crore
RegionWest India

Safety Tips for Driving on the Nashik-Solapur-Akkalkot Expressway

  • ⚠️Strictly follow the speed limit of 100 km/h. Overspeeding on expressways attracts heavy fines.
  • ⚠️Always wear seatbelts. Rear-seat passengers must also buckle up on expressways.
  • ⚠️Do not stop on the main carriageway. Use designated rest areas and parking zones.
  • ⚠️Maintain lane discipline — use the right lane only for overtaking.
  • ⚠️Keep a safe following distance of at least 3 seconds at expressway speeds.
  • ⚠️Use headlights even during daytime as per expressway rules.
  • ⚠️In case of breakdown, move to the shoulder immediately and use hazard lights.
  • ⚠️In an emergency, call 112 (Unified Emergency) or 1033 (Highway Helpline).

Frequently Asked Questions

What is the total length of the Nashik-Solapur-Akkalkot Expressway?
The Nashik-Solapur-Akkalkot Expressway has a total length of 374 km. It connects Nashik (Maharashtra) to Akkalkot (Solapur, Maharashtra).
What is the current status of the Nashik-Solapur-Akkalkot Expressway?
The Nashik-Solapur-Akkalkot Expressway is currently under construction and is expected to be completed by 2028.
Which states does the Nashik-Solapur-Akkalkot Expressway pass through?
The Nashik-Solapur-Akkalkot Expressway passes through Maharashtra.
What is the speed limit on the Nashik-Solapur-Akkalkot Expressway?
The speed limit on the Nashik-Solapur-Akkalkot Expressway is 100 km/h.
How many lanes does the Nashik-Solapur-Akkalkot Expressway have?
The Nashik-Solapur-Akkalkot Expressway has 6 lanes (access-controlled).
What is the cost of the Nashik-Solapur-Akkalkot Expressway project?
The Nashik-Solapur-Akkalkot Expressway project has an estimated cost of Rs 19,142 crore.
What are the major cities connected by the Nashik-Solapur-Akkalkot Expressway?
The major cities and towns along the Nashik-Solapur-Akkalkot Expressway include Nashik, Ahmednagar, Solapur, Akkalkot.
Who is the operator of the Nashik-Solapur-Akkalkot Expressway?
The Nashik-Solapur-Akkalkot Expressway is operated/developed by National Highways Authority of India (NHAI).
What are the key features of the Nashik-Solapur-Akkalkot Expressway?
Key features of the Nashik-Solapur-Akkalkot Expressway include: CCEA approved December 31, 2025 at ₹19,142 crore (BOT-Toll); Saves 201 km distance and up to 17 hours travel time; Connects to Delhi-Mumbai Expressway near Vadhavan Port interchange; Links Samruddhi Mahamarg (Pangri near Nashik) and Agra-Mumbai Corridor (NH-60 at Adgaon); Expected to generate ~251 lakh direct + ~314 lakh indirect man-days employment; Entirely within Maharashtra.

Planning a Trip on the Nashik-Solapur-Akkalkot Expressway?

Check out our road safety guides and expressway speed limits.

Related Expressways

Other Expressways in Maharashtra

Explore More on SignalPe