NH 754 route
4 towns, start to end- BhatindaMeets NH 54Start
- Muktsar
- Saidoke
- JalalabadEnd
Route as described in the NH list
NH54 near Bhatinda, Muktsar, Saidoke, Jalalabad
Speed limit on NH 754
km/h| Vehicle | 4-lane divided | Other |
|---|---|---|
| Cars, jeeps and vans (M1) | 100 | 70 |
| Buses (M2/M3) | 90 | 60 |
| Goods vehicles (all N category) | 80 | 60 |
| Motorcycles | 80 | 60 |
| Three-wheelers | 50 | 50 |
Maximum speeds under MoRTH notification S.O. 1522(E) of 6 April 2018: the first figure applies on four-lane-and-wider divided sections, the second on other sections (most two-lane stretches). A lower limit notified for a stretch and shown on signs always applies.
Driving safely on NH 754
- Keep to the posted limit: at most 100 km/h for cars on four-lane divided sections and 70 km/h on two-lane sections, and lower for buses and goods vehicles.
- Wear seatbelts and make sure every passenger is buckled up.
- Do not overtake on curves, bridges or narrow sections.
- Keep a safe following distance, especially in the monsoon.
- Use headlights even in daytime on highways.
- Take a break every 2 hours on long drives to avoid fatigue.
Questions about NH 754
Where does National Highway 754 start and end?
National Highway 754 starts from Bhatinda and ends at Jalalabad, covering a total distance of 70 km.
Which states does National Highway 754 pass through?
National Highway 754 passes through Punjab.
What are the major cities on National Highway 754?
The major cities and towns along National Highway 754 include Bhatinda, Muktsar, Saidoke, Jalalabad.
What is the total length of National Highway 754?
The total length of National Highway 754 is 70 km.
Is National Highway 754 a primary or secondary national highway?
National Highway 754 is a secondary/branch national highway that branches from NH 54.
What is the speed limit on National Highway 754?
Under MoRTH notification S.O. 1522(E) of 6 April 2018, on National Highway 754 cars may go up to 100 km/h on four-lane divided carriageways and 70 km/h on other roads; buses 90/60 km/h; goods vehicles and motorcycles 80/60 km/h (MoRTH S.O. 1522(E), 6 April 2018). A lower limit notified for a stretch and shown on signs always applies.
What is the route of National Highway 754? (Route Map)
National Highway 754 follows this route: NH54 near Bhatinda, Muktsar, Saidoke, Jalalabad — starting at Bhatinda and ending at Jalalabad.