NH 719 route
3 towns, start to end- EtawahMeets NH 19Start
- Bhind
- GwaliorMeets NH 44End
Route as described in the NH list
(NH92) NH19 near Etawah, Bhind, NH44 near Gwalior
Speed limit on NH 719
km/h| Vehicle | 4-lane divided | Other |
|---|---|---|
| Cars, jeeps and vans (M1) | 100 | 70 |
| Buses (M2/M3) | 90 | 60 |
| Goods vehicles (all N category) | 80 | 60 |
| Motorcycles | 80 | 60 |
| Three-wheelers | 50 | 50 |
Maximum speeds under MoRTH notification S.O. 1522(E) of 6 April 2018: the first figure applies on four-lane-and-wider divided sections, the second on other sections (most two-lane stretches). A lower limit notified for a stretch and shown on signs always applies.
Driving safely on NH 719
- Keep to the posted limit: at most 100 km/h for cars on four-lane divided sections and 70 km/h on two-lane sections, and lower for buses and goods vehicles.
- Wear seatbelts and make sure every passenger is buckled up.
- Do not overtake on curves, bridges or narrow sections.
- Keep a safe following distance, especially in the monsoon.
- Use headlights even in daytime on highways.
- Take a break every 2 hours on long drives to avoid fatigue.
Questions about NH 719
Where does National Highway 719 start and end?
National Highway 719 starts from Etawah and ends at Gwalior, covering a total distance of 122.6 km.
Which states does National Highway 719 pass through?
National Highway 719 passes through Madhya Pradesh, Uttar Pradesh.
What are the major cities on National Highway 719?
The major cities and towns along National Highway 719 include Etawah, Bhind, Gwalior.
What is the total length of National Highway 719?
The total length of National Highway 719 is 122.6 km.
Is National Highway 719 a primary or secondary national highway?
National Highway 719 is a secondary/branch national highway that branches from NH 19.
What is the speed limit on National Highway 719?
Under MoRTH notification S.O. 1522(E) of 6 April 2018, on National Highway 719 cars may go up to 100 km/h on four-lane divided carriageways and 70 km/h on other roads; buses 90/60 km/h; goods vehicles and motorcycles 80/60 km/h (MoRTH S.O. 1522(E), 6 April 2018). A lower limit notified for a stretch and shown on signs always applies.
What is the route of National Highway 719? (Route Map)
National Highway 719 follows this route: (NH92) NH19 near Etawah, Bhind, NH44 near Gwalior — starting at Etawah and ending at Gwalior.