NH 344M route
7 towns, start to end- Bankoli VillageMeets NH 44Start
- Narela
- Mundka
- Najafgarh
- Dwarka
- B
- Bhartal chowkMeets NH 248BBEnd
Route as described in the NH list
NH44 near Bankoli Village, Narela, Mundka, Najafgarh, Dwarka, NH248BB near Bhartal chowk
Speed limit on NH 344M
km/h| Vehicle | 4-lane divided | Other |
|---|---|---|
| Cars, jeeps and vans (M1) | 100 | 70 |
| Buses (M2/M3) | 90 | 60 |
| Goods vehicles (all N category) | 80 | 60 |
| Motorcycles | 80 | 60 |
| Three-wheelers | 50 | 50 |
Maximum speeds under MoRTH notification S.O. 1522(E) of 6 April 2018: the first figure applies on four-lane-and-wider divided sections, the second on other sections (most two-lane stretches). A lower limit notified for a stretch and shown on signs always applies.
Driving safely on NH 344M
- Keep to the posted limit: at most 100 km/h for cars on four-lane divided sections and 70 km/h on two-lane sections, and lower for buses and goods vehicles.
- Wear seatbelts and make sure every passenger is buckled up.
- Do not overtake on curves, bridges or narrow sections.
- Keep a safe following distance, especially in the monsoon.
- Use headlights even in daytime on highways.
- Take a break every 2 hours on long drives to avoid fatigue.
Questions about NH 344M
Where does National Highway 344M start and end?
National Highway 344M starts from Bankoli Village and ends at Bhartal chowk, covering a total distance of 25.7 km.
Which states does National Highway 344M pass through?
National Highway 344M passes through Delhi.
What are the major cities on National Highway 344M?
The major cities and towns along National Highway 344M include Bankoli Village, Narela, Mundka, Najafgarh, Dwarka, B.
What is the total length of National Highway 344M?
The total length of National Highway 344M is 25.7 km.
Is National Highway 344M a primary or secondary national highway?
National Highway 344M is a secondary/branch national highway that branches from NH 44.
What is the speed limit on National Highway 344M?
Under MoRTH notification S.O. 1522(E) of 6 April 2018, on National Highway 344M cars may go up to 100 km/h on four-lane divided carriageways and 70 km/h on other roads; buses 90/60 km/h; goods vehicles and motorcycles 80/60 km/h (MoRTH S.O. 1522(E), 6 April 2018). A lower limit notified for a stretch and shown on signs always applies.
What is the route of National Highway 344M? (Route Map)
National Highway 344M follows this route: NH44 near Bankoli Village, Narela, Mundka, Najafgarh, Dwarka, NH248BB near Bhartal chowk — starting at Bankoli Village and ending at Bhartal chowk.