NH 143AG route
6 towns, start to end- LohardagaMeets NH 143AStart
- Bhandra
- Bero
- Karra
- Khunti
- TamarMeets NH 43End
Route as described in the NH list
NH 143A near Lohardaga, Bhandra, Bero, Karra, Khunti, NH 43 near Tamar
Speed limit on NH 143AG
km/h| Vehicle | 4-lane divided | Other |
|---|---|---|
| Cars, jeeps and vans (M1) | 100 | 70 |
| Buses (M2/M3) | 90 | 60 |
| Goods vehicles (all N category) | 80 | 60 |
| Motorcycles | 80 | 60 |
| Three-wheelers | 50 | 50 |
Maximum speeds under MoRTH notification S.O. 1522(E) of 6 April 2018: the first figure applies on four-lane-and-wider divided sections, the second on other sections (most two-lane stretches). A lower limit notified for a stretch and shown on signs always applies.
Driving safely on NH 143AG
- Keep to the posted limit: at most 100 km/h for cars on four-lane divided sections and 70 km/h on two-lane sections, and lower for buses and goods vehicles.
- Wear seatbelts and make sure every passenger is buckled up.
- Do not overtake on curves, bridges or narrow sections.
- Keep a safe following distance, especially in the monsoon.
- Use headlights even in daytime on highways.
- Take a break every 2 hours on long drives to avoid fatigue.
Questions about NH 143AG
Where does National Highway 143AG start and end?
National Highway 143AG starts from Lohardaga and ends at Tamar, covering a total distance of 134.5 km.
Which states does National Highway 143AG pass through?
National Highway 143AG passes through Jharkhand.
What are the major cities on National Highway 143AG?
The major cities and towns along National Highway 143AG include Lohardaga, Bhandra, Bero, Karra, Khunti, Tamar.
What is the total length of National Highway 143AG?
The total length of National Highway 143AG is 134.5 km.
Is National Highway 143AG a primary or secondary national highway?
National Highway 143AG is a secondary/branch national highway that branches from NH 43.
What is the speed limit on National Highway 143AG?
Under MoRTH notification S.O. 1522(E) of 6 April 2018, on National Highway 143AG cars may go up to 100 km/h on four-lane divided carriageways and 70 km/h on other roads; buses 90/60 km/h; goods vehicles and motorcycles 80/60 km/h (MoRTH S.O. 1522(E), 6 April 2018). A lower limit notified for a stretch and shown on signs always applies.
What is the route of National Highway 143AG? (Route Map)
National Highway 143AG follows this route: NH 143A near Lohardaga, Bhandra, Bero, Karra, Khunti, NH 43 near Tamar — starting at Lohardaga and ending at Tamar.